Train Simulator Classic 2024

Train Simulator Classic 2024

New York Division-Bergen County Line
Minerman146  [developer] 1 Jun, 2014 @ 1:37pm
Work In Progress
The WIP thread will cover what is going on with the with route progress to the end of the line.. Each entry will contain a summary of work and the duration of time.
Last edited by Minerman146; 26 Oct, 2016 @ 10:59am
< >
Showing 1-15 of 1,895 comments
Minerman146  [developer] 1 Jun, 2014 @ 1:40pm 
Sun, June 1, 2014 - work on labeling the sidings, platforms and destination points are in progress. We were able to successfully test labeling sidings and platforms in route editor and have them transfer to new scenarios.
Minerman146  [developer] 1 Jun, 2014 @ 1:42pm 
We feel that labeling the platforms and destinations using an Eastward - Westward designation will allow us to better control AI and keep it on the correct track.
Minerman146  [developer] 1 Jun, 2014 @ 10:09pm 
Label Yard Tracks, Sidings, Platforms and some destinations. Work on Track on Piermont Line. Need to correct elevation between Dunigan Rd and Rt.52.
Minerman146  [developer] 2 Jun, 2014 @ 11:07am 
Morning 840-915am - High Tension wire installation Hillburn Substation to Mahwah Substation.
Minerman146  [developer] 2 Jun, 2014 @ 9:57pm 
Substation North of Hillburn complete, Old Station, parking lot, palisades fence Suffern, complete. Ford Track West of Plant scenery very near complete. Bad signal westbound protecting Piermont Bracn
Minerman146  [developer] 3 Jun, 2014 @ 8:37am 
Correct Elevations and streets west of mainline. Add rolling stock to Mahwah yard for scenario time 830-915am Bad signal is at west end of Hillburn Yard
Minerman146  [developer] 3 Jun, 2014 @ 9:57pm 
Mountain West of Ford done, RT 17 South of Ford and interchange complete. Filled Hillburn Yard with freight. Master Scenario Populated. To determine - Switching or simple A to B scenario. Need to change yard speed to 10 mph and line west of hillburn to 60/50
Minerman146  [developer] 4 Jun, 2014 @ 8:57am 
820-905am Add telegraph and light poles to Suffern. Test run diesel in Mahwah yard.
Minerman146  [developer] 4 Jun, 2014 @ 10:38am 
Tonight - Change remaining mainline speed to 60/50, change yard to 15/10, spur to Ford to 15, Hillburn and Ford 10, reduce Curve West of Tuxedo per orders to 50/40, locate any other relevant orders. Shrink yard markers and add East/West ends for more specific drop points
Minerman146  [developer] 4 Jun, 2014 @ 10:06pm 
Set Main to 60/50 to Bergan County Line, All yards and sidings 10, Piermont Branch 20,
50 from Suffern Station to West End Hillburn Track 1 and 2, exception Track 1 West of Station Plaform to SF tower is 40,Tracks 1 and 2 Curves west of Tuxedo 35. Track at newburgh jct is 50/50, Track west of NJ is 60/60
Minerman146  [developer] 4 Jun, 2014 @ 10:36pm 
Old main is 50/40 through the wye east, wye west is 30/20
Minerman146  [developer] 5 Jun, 2014 @ 7:55am 
Add streetlights around plant and in suffern, Considering running first scenario at 130am instead of pm. Test drive hillburn and ford yard to test speed limits ... 10 mph is slow
Minerman146  [developer] 5 Jun, 2014 @ 4:03pm 
Considering a route update tonight. - more important... a first stab at the scenario.
Minerman146  [developer] 6 Jun, 2014 @ 6:12am 
2000-0130 Work on Scenario, Create DN-90, SD70M, set destination and waypoints. Failed to create consist as units were telescoping
Minerman146  [developer] 6 Jun, 2014 @ 6:13am 
0820-0910 create Ford Parts Consist and Croxton Consist for DN-90. Problem putting green marker (destination) or any markers down in copied scenario will work during night.
< >
Showing 1-15 of 1,895 comments
Per page: 1530 50